Power Plant has three boilers (2 x 35 tons/h and 1 x 70 tons/h) and two steam turbines with a total designed capacity of 16 MW per hour, out of which 8 MW is used internally while the balance is intended for sale.
The company has a water purification plant, which supplies decarbonized and demineralized water. Decarbonized water is used for coke quenching. Separate pumping stations provide water for sanitary needs and technological purposes.
The water treatment plant is used to supply water to the town of Lukavac.